2004 Projects
Building a road is not easy! It is done in three distinct steps.

1. Prepare the subgrade or the basement of the road. The roadbed must be graded smooth and level and the drainage on either side of the road has to be prepared.

2. Tons of flexbase (a special mixture of rock, gravel and dirt) is dumped on the road and is leveled, smoothed, hardened and made ready for the next step. This is what the asphalt sits upon and it must be made hard and level.

3. Asphalt laydown. The asphalt is applied upon the newly prepared roadbed.

Roads on this list will be upgraded to asphalt ONLY if the county can obtain the required right-of-way easement from the adjoining landowners.
NOTE: ** Thoroughfare plan roads require more than standard 60 feet of right-of-way.

Major road projects
CR STATUS DESCRIPTION MILES
CR605 Complete From CR588 East to CR604 0.92
CR697 Complete From hwy 380 South to CR649 3.03
CR800 Complete From FM1138 Northeast to CR590 1.46
TOTAL     5.41
Road participation projects
CR STATUS DESCRIPTION MILES
CR132 Complete 1000 feet to pavement North .20
CR179 Complete From CR176 East to cul-de-sac 1.10
CR220 Complete From CR179 North to Grayson County line 0.25
CR336 Active From end of pavement North 0.61
CR366** Active From hwy 75 East to hwy 5 1.92
TOTAL     4.08
Asphalt 5-mile road projects
CR STATUS DESCRIPTION MILES
CR172 Complete From FM455 South to cul-de-sac 1.30
CR535 Complete From FM2755 West to cul-de-sac 0.66
CR551 Complete From CR550 North to CR552 0.50
CR674 Complete From CR673 North to Fannin County line 0.03
CR786 Complete From FM2755 West to cul-de-sac 0.16
CR830 Complete From CR1106 North to Grayson County line 0.96
CR832 Complete From CR500 Southeast to cul-de-sac 1.37
CR1204 Complete From CR578 South to cul-de-sac 0.35
TOTAL     5.70
Replacement road projects
CR STATUS DESCRIPTION MILES
CR426 Complete From CR1106 South to CR376 0.90
CR599 Complete From FM1778 North to CR566 1.50
CR648 Complete From FM547 Northwest to South Lake Road 1.55
CR649 Complete From FM547 to CR697 1.17
TOTAL     5.14
Reconstruction projects
CR STATUS DESCRIPTION MILES
CR168 Complete From CR166 West to CR165 1.00
CR202 Complete From FM543 Southwest to McKinney city limit 0.95
CR382 Complete North to South section from CR733 to Wylie city limits 0.41
CR434 Complete From state hwy 78 Southwest to CR382 0.47
CR436 Complete From CR735 to Clear Lake Park 0.47
CR483 Complete From CR205 West to sub-division 2.12
CR489 Complete 700 feet through "S" curve west of railroad track 0.09
CR490 Complete From hwy 380 South to CR491 1.97
CR491 Complete From CR490 East to end of asphalt 0.81
Chaparral Trot Complete Unscheduled project to rebuild road 0.43
TOTAL     8.66