Building a road is not easy! It is done in distinct steps.
1. Acquire the proper Right-of-Way (ROW). In those cases where the road must be
widened, the County must acquire Right-of-Way. Failure to get the proper ROW from
county citizens might require delay the project significantly.
2. Subgrade processing - Prepare the subgrade or the basement of the road.
The roadbed must be graded smooth and level and the drainage
on either side of the road has to be prepared. Culverts must be installed and/or
replaced.
3. Flexbase processing - Tons of flexbase (a special mixture of rock, gravel and dirt)
is dumped on the road and is leveled, smoothed, hardened and made ready for
the next step. This is what the asphalt sits upon and it must be made hard and level.
4. Asphalt laydown - The asphalt is applied upon the newly prepared roadbed.
Roads on this list will be upgraded to asphalt ONLY if the county
can obtain the required right-of-way easement from the adjoining
landowners.
| Major Road Projects |
| CR |
STATUS |
DESCRIPTION |
MILES |
| CR74 |
Completed:11-Aug-05 |
US380 north to CR78 |
0.97 |
| CR78 |
Completed:11-Aug-05 |
CR74 west .52 miles |
0.38 |
| CR80 |
Completed:11-Aug-05 |
CR74 north |
1.01 |
| CR135 |
Completed:8-Aug-05 |
CR132 east to CR136 |
1.50 |
| CR177 |
Completed:8-Aug-05 |
CR135 east to CR176 |
0.85 |
| CR209 |
Completed:12-Jul-05 |
FM543 northeast to CR210 |
1.40 |
| CR210 |
Completed:12-Jul-05 |
CR209 east to FM455 |
1.40 |
| CR283 |
Completed |
US75 west to CR286 |
0.44 |
| CR286 |
Completed |
FM455 south to CR283 |
3.78 |
| CR366 |
Completed:28-Apr-05 |
US75 east to CR365 |
1.72 |
| CR371 |
Completed:28-Jul-05 |
SH5 west to US75 |
1.85 |
| CR411 |
Completed:29-Jun-05 |
CR410 southeast to CR341 |
0.48 |
| CR434 |
Completed:20-Jun-05 |
SH78 south to asphalt |
0.70 |
| CR442 |
Completed:30-Aug-05 |
FM982 to CR1102 |
1.63 |
| CR452 |
Completed:20-Jul-05 |
FM982 east to cul-de-sac |
0.93 |
| CR470 |
Completed:11-May-05 |
FM1377 east to FM1827 |
3.06 |
| CR472 |
Completed:28-Apr-05 |
CR475 southwest to CR474 |
0.99 |
| CR475 |
Completed:28-Apr-05 |
SH121 southwest to CR472 |
0.76 |
| CR483 |
Completed:26-Oct-04 |
CR538 south to asphalt |
1.65 |
| CR545 |
Completed:07-Jun-05 |
SH78 southwest to CR488 |
1.57 |
| CR562 |
Completed:27-Jun-05 |
CR561 northwest to Sister Grove Park |
0.42 |
| CR571 |
Completed:11-May-05 |
FM1377 east to CR570 |
1.00 |
| CR583 |
Completed:26-May-05 |
SH78 west to CR579 |
0.47 |
| CR597 |
Completed:4-Sep-05 |
End of asphalt northeast to CR566 |
1.43 |
| CR601 |
Completed:8-Nov-04 |
CR605 south to CR566 |
1.72 |
| CR622 |
Completed:26-May-05 |
SH78 east to CR620 |
1.64 |
| CR628 |
Completed:22-Sep-05 |
FM981 south to CR825 |
1.20 |
| CR634 |
Completed:26-May-05 |
CR580 north to county line |
0.41 |
| CR638 |
Completed |
FM1777 west to CR637 |
1.47 |
| CR643 |
Completed:14-Jun-05 |
FM547 west to CR645 |
1.11 |
| CR645 |
Completed:14-Jun-05 |
CR643 north to CR605 |
1.84 |
| CR657 |
Completed:20-Jul-05 |
CR660 west to CR1027 |
0.91 |
| CR658 |
Completed:24-May-05 |
CR656 north to FM2194 |
2.23 |
| CR665 |
Completed:25-May-05 |
CR618 northwest to asphalt |
0.65 |
| CR668 |
Completed:25-May-05 |
CR825 east to Hunt county |
2.90 |
| CR669 |
Completed:25-May-05 |
FM1562 south to CR1004 |
2.51 |
| CR825 |
Completed:25-May-05 |
Asphalt south to CR622 |
0.94 |
| CR834 |
Completed:26-May-05 |
CR669 west to cul-de-sac |
0.68 |
| CR988 |
Completed:23-Sep-05 |
FM1827 north to cul-de-sac |
0.41 |
| CR989 |
Completed:23-Sep-05 |
FM1827 north to cul-de-sac |
0.28 |
| CR997 |
Completed:29-Jun-05 |
Small loop at FM2933 |
0.19 |
| CR1220 |
Completed:09-May-05 |
SH121 to CR472 |
1.13 |
| TOTAL PAVED |
52.79 |
| TOTAL IN PROGRESS |
00.00 |
|