Tons of special rock material is placed on the roadway.
|
| |
ROCK DELIVERY
This material is then graded smooth and compacted to make a good hard,
level base for the asphalt material.
Each “belly dump” can hold up to 13 tons of rock
|
|
CLOSE UPS OF ROCK BEING DEPOSITED
This material comes from several stockpiles around the county
|
|
LEVELLING THE ROCK
After the rock is deposited, grader makes ready to level the rock.
|
|
HERE COMES THE GRADER!
|
|
ROCK THICKNESS
The grader levels the newly deposited rock material to about 8" thickness.
The thickness depends upon how high the roadbed needs to be.
|
|
SLUSHING THE ROAD
The road is "slushed", that is, water is applied to the base.
This brings the “fines” to the surface where they will be compacted by heavy rollers.
|
|
COMPACTING THE SLUSH
The rollers compact the wet material until it is very smooth and hard,
making it ready for the coming asphalt.
|
|
FINAL RESULT
A nice smooth road surface ready for asphalt!
|
|